Home Corporate information   Contact us
Membrane Structures
TM (Taiyo Multipurpose)Truss Space Frame Systems
Civil Engineering Products
Tent Warehouses
Container Systems
Enginieering,Fabrication&Construction
Civil Engineering Products

 

BASIC INSTALLATION PROCEDURE
  • Loading on to barge
  • Joint connection between each unit
  • Dropping anchor block
  • Sending each unit into the sea
  • Connect anchor ropes to the unit

 

ThisPage's Top